... at http://www.inwoba.de you can follow the usual setup.
On 2011.03.19 I wrote that "with the current pace Critter should pass the current IPON leader on 2011.07.27 - give or take a few days". Now it is a month too early ...
Curious to see the result and of course -> Have fun
Ingo
Critter 1.2 SSE42 running for the IPON
Critter 1.2 SSE42 running for the IPON
Ponder ON rating list: http://www.inwoba.de
Re: Critter 1.2 SSE42 running for the IPON
Hello
Finaly Critter 1.2 SSE4.2 is included into the IPON. It needed a bit longer as I wanted to wait for the result vs DF12.
http://www.inwoba.de
Bye
Ingo
Finaly Critter 1.2 SSE4.2 is included into the IPON. It needed a bit longer as I wanted to wait for the result vs DF12.
http://www.inwoba.de
Bye
Ingo
Ponder ON rating list: http://www.inwoba.de